Skip to main content
Request access

One place to run your lake and keep everyone informed.

Your district already watches the lake, runs the dam, answers residents, and reports to the board and the DNR. Today it is spread across notebooks, spreadsheets, agency websites, and inboxes. Lake Almanac keeps it in one record the district owns.

Price
$400 a month
Billed annually at $4,800 per lake
Billing
Once a year
ACH or card. No setup fee.
Setup
We do it with you
Old records, subscribers, gauges
Your website
Keep it or use ours
A district website is included

The problems it solves

Each row is work the district already does. The right column is what changes on day one.

  • Showing the DNR how the dam was run

    What happens today: Gate changes go in a notebook. Lake levels sit on a USGS website. Lining them up for the DNR or an engineer takes hours.

    With Lake Almanac: Each day's dam log saves the latest lake level, inflow, and outflow from the gauges, with the lake level on your order's scale. Print the daily or monthly log with a signature line, or download it as CSV.

  • Knowing where the lake stands against the order

    What happens today: Seasonal ranges, drawdown dates, and gate rules are buried in a long order. Few people can say at a glance whether today's level is in range.

    With Lake Almanac: Upload the order. Lake Almanac reads the seasonal ranges, and you check every number before anything goes live. Today's level shows against the authorized range, with the drawdown schedule in plain words. Every version of the order is kept.

  • Gauge data nobody looks at

    What happens today: Public gauges record the lake every 15 minutes, but the readings sit on agency websites that few people open.

    With Lake Almanac: Lake level, river flow, and weather on one page, with charts on the same timeline. Every reading shows how old it is. Late or missing readings are labeled, never hidden.

  • Rebuilding the board packet

    What happens today: Before each meeting someone copies numbers from several websites and a spreadsheet into a new report.

    With Lake Almanac: Pick a month or quarter and get a dated report: time inside the authorized range, gate changes, notes, and every gap in the data. Print it, download the CSVs, or send a link to the board, engineer, DNR, or counsel, without internal notes.

  • The same question from every resident

    What happens today: High water starts the rumor. Phone calls, Facebook, and email carry different numbers.

    With Lake Almanac: Residents bookmark one official page and can sign up for a weekly email and high-water alerts, sent in your district's name. Staff can send their own update when plans change.

  • An old website and a 2028 accessibility deadline

    What happens today: Many district websites are hard to update and hard to use on a phone or with a screen reader. The federal web accessibility rule applies to most districts on April 26, 2028.

    With Lake Almanac: Keep your site and add a link, or use the included district website: notices, meetings, documents, and board members beside live lake conditions. Designed and regularly tested against WCAG 2.2 Level AA.

  • Knowledge that leaves with people

    What happens today: When an operator, clerk, or commissioner steps down, the history leaves in their notebook or inbox.

    With Lake Almanac: The record belongs to the district. A correction is added below the old one and never erases it. Each new person gets a login with the right access: owner, admin, operator, or view-only.

How we set the district up

We set the district up with you, and when something gets stuck you email a real person who knows the product.

  1. Request access. Tell us your district. We set up its workspace and invite you.

  2. Hands-on custom setup. Lake Almanac works with your district to import old records, bring in existing email subscribers, set contact information, connect gauges, and configure the public page.

  3. Invite the district. Authorized users receive access to the operating record, with the right permissions.

  4. Go live. The public lake page goes live once the district subscribes. Operators can log work from a phone, tablet, or computer.

One lake. $400 a month.

Billed annually at $4,800

No setup fee. No commitment. No multi-year contract. Cancel anytime. Pay annually by ACH or card.

Everything is included

  • Public lake page and district website
  • Dam log with automatic gauge readings
  • Authorized levels from your order
  • Dated board reports, PDF and CSV
  • Weekly, high-water, and outage emails
  • Logins for staff, operators, and the board
  • Hands-on setup and a real person to email
  • USGS readings checked hourly; climate stations every six hours

No new gauges when your lake already has one. One subscription covers one lake and the gauges, river sources, and dam that go with it.

Coming next, at no extra cost

These optional capabilities are not required to use Lake Almanac. They are in development and will be included in the subscription when available, at no extra cost.

  • Optional online forms. Permits, signups, volunteer intake. The request lands in the record instead of an inbox full of PDFs.

  • Optional custom domain. Connect a domain the district owns, if it wants one. People keep the address they already know.

  • Optional asset and maintenance records. Track district assets, inventory, inspections, repairs, locations, and scheduled work in the same system.

What Lake Almanac does not do

You still run the dam and work with your engineer and the DNR. Lake Almanac does not control gates, give engineering or legal advice, decide whether you are in compliance, replace an approved IOM or EAP, or file anything for you. It keeps the record and shows the numbers in context.

See it live

The Rock Koshkonong Lake District demo shows Lake Koshkonong with live USGS data: lakealmanac.com/p/wi/lake-koshkonong-board-demo/rock-koshkonong

Suggested board motion

“I move to authorize the district to subscribe to Lake Almanac at $4,800 per year, with no setup fee.”